Thyssenkrupp Levant Stair Lift Installation Manual Top ~repack~

Drive the lift down and gently tap each pad. The lift must stop instantly. Drive the lift up and repeat the test. Swivel Interlock Switch Swivel the seat at the top landing.

Anodized silver aluminum rail with an integrated steel gear rack Phase 1: Pre-Installation Prep & Rail Prep Measuring and Cutting the Track

The Levant uses charging points at the top and bottom of the stairs. The transformer should be connected to the charging contacts closest to a power outlet (e.g., a 220V wall socket). thyssenkrupp levant stair lift installation manual top

Before unboxing any components, you must ensure your staircase is prepared and meets the minimum spatial requirements. Safety and precision at this stage prevent mechanical failures later on. The Thyssenkrupp Levant

The Levant runs on 24V DC battery power and charges automatically when parked at the top or bottom of the stairs. Drive the lift down and gently tap each pad

: At the top of the stairs, the rail is capped, and final safety sensors are tested. These sensors are vital; they detect obstructions on the staircase and will stop the lift immediately to prevent accidents. Levant Stairlift User Manual | PDF | Chair - Scribd

: Secure the top mechanical stops and final rail sections. Swivel Interlock Switch Swivel the seat at the top landing

Carefully inventory all packages. A standard shipment includes the rail sections, the drive chassis (carriage), the seat assembly, the footrest, charging blocks, brackets, and a hardware kit. Required Tools Metric Allen wrench set (specifically 4mm, 5mm, and 6mm) Socket wrench set (10mm, 13mm, and 17mm)

Connect the wire leads directly to the terminals on the back of the charging strips. Maintain correct polarity as marked (+ and -).

Slide the batteries into the carriage unit.