Installation Manual [new] — Gunnebo Speedstile Fl

For any issue, first consult the fault messages on the GC01 display for specific diagnostic codes (Section 8.1). Basic checks include verifying voltage (230VAC mains, 24VDC), checking fuses on all boards, and ensuring cable connections are secure.

Before beginning any installation or maintenance work on the SpeedStile FL, it is mandatory to follow all safety warnings provided in the official manual. The electrical systems within these units operate at a voltage high enough to endanger life. Verification tests should be performed to ensure isolation is complete before proceeding.

across the entire footprint of the lane. Uneven floors cause structural stress and panel misalignment. The concrete slab must be a minimum of gunnebo speedstile fl installation manual

Manually test that the glass wings move freely without rubbing against the cabinet body. Switch on the main AC circuit breaker.

Ensure all electrical and data conduits project at least 50mm above the finished floor level into the designated cabinet base openings. Step 3: Positioning and Leveling the Cabinets For any issue, first consult the fault messages

: Run under-floor conduits (minimum 20mm diameter) at least 140mm below the finished floor level, ensuring they rise 50mm from the foundation into the cabinet. 2. Mechanical Installation SpeedStile FL

Drill holes to the depth specified by the manufacturer's anchor bolts. The electrical systems within these units operate at

Pre-install separate conduits for high-voltage power lines and low-voltage signal/communication cables to prevent Electromagnetic Interference (EMI). 2. Unboxing and Component Identification

The base should be concrete with a minimum resistance of fckcube 30N/mm² .

All electrical work must be performed by authorized personnel according to the manual's specifications.