En 17168 📥
To maintain reliable train operations, the platform barrier system must function as a real-time extension of the rail line's automatic train control (ATC) infrastructure. Control Logic
: Vehicle doors and platform doors must open and close simultaneously within strict millisecond tolerances.
: Interface protocols connecting the barrier system directly to the train’s onboard systems and trackside signalling network. Technical Exclusions en 17168
: Automated doors must align safely with arriving rolling stock doors.
: Responsible for specifying retrofit or new-build requirements. To maintain reliable train operations, the platform barrier
Every 12 meters (or less), there must be a or swing gate that:
This wide applicability ensures that the standard's principles are robust regardless of the station type. To maintain reliable train operations
Eliminates accidental track falls, intentional trespassing, and platform overcrowding accidents.